Project

Companion to success

Factory production bearings, gears, gearboxes, parts movement control and communications

Xí nghiệp sản xuất bi, bánh răng, hộp số, các bộ phận đIều khiển và truyền chuyển động

PROJECT: FACTORY PRODUCTION BEARINGS, GEARS, GEARBOXES, PARTS MOVEMENT CONTROL AND COMMUNICATIONS

Test Items: 65M x 300M (1 floor + roof)

Inspection purpose: Inspecting the foundation, structure for the expansion of the workshop, verifying and assessing the safety ability of the structure to bear the load.

Share:

Share on facebook
Facebook
Share on twitter
Twitter
Share on pinterest
Pinterest
Share on linkedin
LinkedIn

Related projects

Nhà xưởng cho thuê
Project

Factory for lease

PROJECT: FACTORY FOR LEASE Test Items: 50M x 80M (4 Block workshops) Inspection purpose: check texture, raising mezzanine floor, serving the function of conversion workshops, verifying and assessing the safety ability of the structure to

Read more »
Nhà máy sản xuất giấy
Project

Factory‘s paper production

PROJECT: FACTORY’S PAPER PRODUCTION Test Items: 100M x 70M (1 ground floor, 1 floor and roof) Purposes inspection: Checking connections, bolts, serving the maintenance of the construction workshop, verifying and assessing the safety ability of

Read more »
Văn phòng dịch vụ cảng
Project

Port service office

PROJECT: PORT SERVICE OFFICE Test Items: Side works Inspection purpose: Measuring the thickness of the coating roofing, roof, roof purlins, serving the construction maintenance process of construction works, verifying and assessing the safety ability of

Read more »

Connect with us

vietsum@vietsum.vn

096 613 9597